Deskripsi
Hydrogen Generator, Integrated Hydrogen Production and Drying Unit
Series : DQ Series
Type : Water Electrolysis Hydrogen Generator
MFR : Suzhou Hydrogen Equipment Co., Ltd.
Equipment composition: main equipment, auxiliary equipment and electronic control equipment.
Main equipment composition: electrolyzer, ancillary equipment integrated frame.
Auxiliary equipment components: water tanks, alkali tanks and make-up water pumps and gas decompression distribution framework.
Composition of electric control equipment: rectifier cabinet, power distribution cabinet, etc.
- The design of the equipment is completely customized for power plant users, with the electrolyzer, gas-liquid treatment device, and hydrogen drying frame assembled into a single frame with a small footprint.
- The product has high hydrogen purity and low moisture content.
- High degree of automation, fully realize fully automatic one key start-stop.
Component Part List :
• Electrolyzer Stack (bi-polar filter type)
• Gas-Lye Separation Frame
• Hydrogen Purifier Unit
• Rectifier Cabinet
• Control Cabinet (PLC + HMI)
• Feed Water Tank
• Lye Tank
• Feed Water Pump
• Cooling System
• Safety Sensors (pressure, temperature, hydrogen leak)
• Gas Distribution Manifold
• Optional Hydrogen Cylinder Filling Interface
| Integrated hydrogen production and drying unit for power plants | ||||
| Model Number | Part Name | Lengths(mm) | Widths(mm) | Heights(mm) |
| DQ-5/3.2 | Organizing Plan I Frame I | 3000 | 2000 | 2150 |
| Organizing Plan II Frame II | 1740 | 1100 | 270(favor) | |
| Organizing Plan III Frame III | 1500 | 1100 | 1500 | |
| DQ-10/3.2 | Organizing Plan I Frame I | 3000 | 2000 | 2450 |
| Organizing Plan II Frame II | 1800 | 1700 | 270(favor) | |
| Organizing Plan III Frame III | 1740 | 1100 | 136 | |
| Main technical indexes of hydrogen production and drying integrated device for power plant | ||||||||
| Hydrogen Generator Model | Hydrogen Yield m3/h | Oxygen Production m3/h | Operating Pressure MPa | Hydrogen Purity% | Hydrogen Dew Point ℃ | Dc Power Consumption
Kw-h/m3H2 |
Tank Overhaul Cycle Time (years) | Control Method |
| DQ-5/3.2 | 5 | 2.5 | 3.2 | ≥99.8 | ≤-50 | ≤4.9 | 5-10 | I II III IV |
| DQ-10/3.2 | 10 | 5 | 3.2 | ≥99.8 | ≤-50 | ≤4.9 | 5-10 | I II III IV |
※This unit package includes integrated hydrogen production device, hydrogen decompression distribution pan, control cabinet, rectifier cabinet, make-up water pump, raw material water tank, lye tank, analysis instrument.
※I Pneumatic unit combination instrument control; II Motorized control; III PLC control; IV Fieldbus control.